Search This Blog

Wikipedia

Search results

Friday, January 3, 2014

Vandenberg Air Force Base

From Wikipedia, the free encyclopedia


Vandenberg Air Force Base Air Force Space Command.png
Part of Air Force Space Command (AFSPC)
Located near: Lompoc, California
Titian IV Centaur - Vandenburg AFB.jpg
Titan IV rocket launch from Space Launch Complex-4 East, Vandenberg AFB, 19 October 2005
Coordinates 34°43′57″N 120°34′05″W
Built 1941
In use 1957 – present
Controlled by  United States Air Force
Garrison 30th Space Wing.png 30th Space Wing
Airfield information
IATA: VBGICAO: KVBGFAA LID: VBG
Summary
Elevation AMSL 369 ft / 112 m
Coordinates 34°43′58″N 120°34′05″WCoordinates: 34°43′58″N 120°34′05″W
Map
KVBG is located in California
KVBG
Location of Vandenberg Air Force Base
Runways
Direction Length Surface
ft m
12/30 15,000 4,572 Concrete
Source: Official website[1] and FAA[2]
Vandenberg Air Force Base (IATA: VBGICAO: KVBGFAA LID: VBG) is a United States Air Force Base, located approximately 9.2 miles (14.8 km) northwest of Lompoc, California. It is under the jurisdiction of the 30th Space Wing, Air Force Space Command (AFSPC).
Vandenberg AFB is a Department of Defense space and missile testing base, with a mission of placing satellites into polar orbit from the West Coast, using expendable boosters (Pegasus, Taurus, Minotaur, Atlas V, Delta IV and now SpaceX's Falcon). Wing personnel also support the Service's LGM-30G Minuteman III Intercontinental Ballistic Missile Force Development Evaluation program.
In addition to its military mission, the base also leases launch pad facilities to SpaceX (SLC-4E), as well as 100 acres (40 ha) leased to the California Spaceport in 1995.
The base is named in honor of former Air Force Chief of Staff General Hoyt S. Vandenberg.

Units

The host unit at Vandenberg AFB is the 30th Space Wing. The 30th SW is home to the Western Range, manages Department of Defense space and missile testing, and places satellites into near-polar orbits from the West Coast. Wing personnel also support the Air Force's Minuteman III Intercontinental Ballistic Missile Force Development Test and Evaluation program. The Western Range begins at the coastal boundaries of Vandenberg and extends westward from the California coast to the Western Pacific, including sites in Hawaii. Operations involve dozens of federal and commercial interests.
The wing is organized into operations, launch, mission support and medical groups, along with several directly assigned staff agencies.
The 30th Launch Group is responsible for booster and satellite technical oversight and launch processing activities to include launch, integration and test operations. The group consists of an integrated military, civilian and contractor team with more than 250 personnel directly supporting operations from the Western Range.
1st Air and Space Test Squadron
4th Space Launch Squadron
The 30th Operations Group provides the core capability for West Coast spacelift and range operations. Operations professionals are responsible for operating and maintaining the Western Range for spacelift, missile test launch, aeronautical and space surveillance missions.
  • 30th Mission Support Group
The 30th Mission Support Group supports the third largest Air Force Base in the United States. It is also responsible for quality-of-life needs, housing, personnel, services, civil engineering, contracting and security.
  • 30th Medical Group
The 30th Medical Group provides medical, dental, bio-environmental and public health services for people assigned to Vandenberg Air Force Base, their families and retirees.
Tenant organizations assigned to Vandenberg are:
[3]

History

General Hoyt S. Vandenberg
Major General Phillip St. George Cooke
Vandenberg Air Force Base is named in honor of the late General Hoyt S. Vandenberg, second Chief of Staff of the United States Air Force and chief architect of today's modern Air Force.[4]
General Vandenberg was born in Milwaukee, Wisconsin, on 24 January 1899. In 1923, he graduated from West Point. During World War II, Colonel Vandenberg was transferred to England and assisted in planning air operations for the invasion of North Africa. He received his first star in December 1942, and became chief of staff of the Twelfth Air Force in North Africa under General James H. Doolittle. During this campaign he flew over two dozen combat missions over Tunisia, Italy, Sardinia, Sicily, and Pantelleria to obtain first hand information.[4]
In March 1945, he was promoted to the rank of lieutenant general, and full general in 1947. Meanwhile, in January 1946, General Vandenberg was appointed chief of the intelligence division of the General Staff. In June, he was named director of the Central Intelligence Group, predecessor to the Central Intelligence Agency formed in 1947.[4]
With the establishment of a separate Air Force in September 1947, Vandenberg became its first vice chief of staff under General Carl Spaatz, and succeeded him on 30 April 1948. He held that post through the critical periods of the Berlin Airlift (1948–1949) and the Korean War (1950–1953).[4]
General Vandenberg retired from the Air Force in June 1953. He died in Washington, D.C. on 2 April 1954.[4]

United States Army

Camp Cooke (1941–1953)

In 1941 the United States Army sought more and better training centers for the rapid development of its armored and infantry forces. In March 1941, the Army acquired approximately 86,000 acres (35,000 ha) of open ranch lands along the Central Coast of California between Lompoc and Santa Maria. Most of the land was purchased. Smaller parcels were obtained either by lease, license, or as easements. With its flat plateau, surrounding hills, numerous canyons, and relative remoteness from populated areas, the Army was convinced it had found the ideal training location.[5]
Construction of the Army camp began in September 1941. Although its completion was still months away, the Army activated the camp on 5 October, and named it Camp Cooke in honor of Major General Phillip St. George Cooke.[5]
General Cooke was a cavalry officer whose military career spanned almost half a century, beginning with his graduation from West Point in 1827 to his retirement in 1873. He participated in the Mexican War, the Indian Wars, and the Civil War. A native of Virginia, General Cooke remained loyal to the Union during the Civil War. Perhaps his most enduring achievement came when as a colonel during the Mexican War, he led a battalion of Mormons from Missouri to California. The route led by Colonel Cooke in 1847 opened the first wagon route to California, and today the railroad follows much of the early wagon trails.[5]
Although the construction of Camp Cooke continued well into 1942, troop training did not wait. The 5th Armored Division rolled into camp in February and March, and the steady roar of its tanks and artillery soon became part of the daily scene. From then until the end of the war, other armored and infantry divisions kept up the din before they too left for overseas duty.[5]
Besides the 5th Division, the 6th, 11th, 13th, and 20th Armored Divisions as well as the 86th and 97th Infantry Divisions, and the 2d Filipino Infantry Regiment were all stationed at Cooke at varying times during the war. Also trained at Cooke were an assortment of anti-aircraft artillery, combat engineer, ordnance, and hospital units. Over 400 separate and distinct outfits passed through Camp Cooke.[5]
As the war progressed, German and Italian prisoners of war (the latter organized into Italian Service Units) were quartered at Camp Cooke. Both groups were kept separate from each other in accordance with the 1929 Geneva Convention on Prisoners of War, and worked on the post at various jobs including mechanical and civil engineering services, clerical positions, food service, and the main laundry. To help relieve the severe labor shortage in the commercial market created by wartime exigencies, the Germans also worked in local communities – mostly in agricultural jobs.[5]
A maximum security army disciplinary barracks was constructed on post property in 1946. Confined to the facility were military prisoners from throughout the Army. When Camp Cooke closed in June 1946, personnel at the disciplinary barracks received the additional duty as installation caretakers. Practically the entire camp was then leased for agriculture and grazing.[5]
From August 1950 to February 1953, Camp Cooke served as a training installation for units slated for combat in Korea, and as a summer training base for many other reserve units. On 1 February 1953, the camp was again inactivated. The disciplinary barracks, meanwhile, was transferred to the U.S. Bureau of Prisons to house civilian offenders in August 1959. Today it is known as the United States Penitentiary at Lompoc.[5]
In September 2000, veterans of the 40th Infantry Division gathered an Vandenberg Air Force Base to dedicate its Korean War Memorial. In June 2001, the final remnants of Camp Cooke, including some barracks used by the 40th Infantry Division during its mobilization for the Korean War, were torn down.[5]

Known United States Army Units at Camp Cooke

World War II
Korean War
[6]

United States Air Force

Cooke Air Force Base

Four years later the military returned to Camp Cooke. With the advent of the missile age in the 1950s, an urgent need arose for an adequate training site that could also serve as America's first combat ready missile base. In January 1956, a select committee was formed that examined more than 200 potential sites before Camp Cooke was chosen, essentially for the same characteristics the Army found desirable in 1941. Besides its size, remoteness from heavily populated areas, and having a moderate climate that afforded year-round operations, most importantly, Cooke's coastal location allowed missiles to be launched into the Pacific Ocean without population overflights. This same geographic feature also enabled satellites to be launched into polar orbit directly toward the South Pole without overflying any land mass until reaching Antarctica.[5]
In September 1956, Secretary of the Air Force, Donald A. Quarles accepted the committee's recommendation. A few weeks later, on 16 November 1956, Secretary of Defense Charles E. Wilson directed the Army to transfer 64,000 acres (26,000 ha) of North Camp Cooke to the United States Air Force for use as a missile launch and training base. In June 1957, North Camp Cooke was renamed Cooke Air Force Base, and on 21 June 1957 was transferred to the Air Force. In January, however, the Air Force, had received access to the camp, and with the arrival of the first airman in February, established on the 15th the 6591st Support Squadron. The initial mission of Cooke AFB was to serve both as a training site for the PGM-17 Thor, SM-65 Atlas, and HGM-25A Titan I missiles, and as an emergency operational facility for Atlas ICBM.[5][7]
The scene that met the first airmen to the base was a cluttered mass of dilapidated World War II buildings amid weeds and brush growing everywhere. Roads-mostly gravel and dirt trails-were in need of extensive repair. In late April 1957, parallel renovation and construction programs started. Over the next two years, missile launch and control facilities began to appear as tons of concrete and steel transformed the landscape. Old buildings were renovated and new ones built, including Capehart military family housing. The work was already in process when the Air Force hosted the official ground breaking ceremonies on 8 May 1957.[5]
To operate Cooke AFB, the 392d Air Base Group was activated, replacing the 6591st Support Squadron on 15 April 1957. With the activation of the 704th Strategic Missile Wing (Atlas) at Cooke on 1 July, the 392d was assigned to the wing. This was the first Air Force ballistic missile wing. On 16 July, the 1st Missile Division, activated three months earlier in Inglewood, California, relocated to Cooke AFB to supervise wing operations. During this formative period, the work of these latter two organizations involved planning for missile operations and training. The Division was assigned to Air Force Ballistic Missile Division (AFBMD) in Inglewood, which in turn reported to Air Research and Development Command (ARDC) at Andrews AFB, Maryland.[5]
The launching of the Russian Sputnik 1 satellite into orbit on 4 October 1957, followed a month later by Sputnik 2 that carried a dog into space, had military implications and caused an immediate acceleration of the United States Air Force's missile program. As part of the acceleration, on 23 November 1957, the Department of Defense authorized the peacetime launching of ballistic, missiles from Cooke AFB. The Air Force transferred management responsibilities for Cooke AFB from ARDC to the Strategic Air Command (SAC) on 1 January 1958. Along with the transfer, SAC acquired the three ARDC base organizations and responsibility for attaining initial operational capability (IOC) for the nascent U.S. missile force. Their mission also included training missile launch crews.[5]
The reorganization allowed ARDC to retain responsibility for site activation as well as research and development testing of ballistic missiles, also known as Category II testing. These activities were carried out by an AFBMD field office established at Cooke shortly after the transfers of January 1958. Space launches were to be conducted by ARDC and SAC. However, the vast majority of these operations were later handled by ARDC. Sharing the mission at Cooke, the two commands cultivated a close relationship that was to flourish for the next 35 years.[5]
On 12 February 1958, the Department, of Defense transferred executive responsibility for the Jupiter IRBM from the Department of the Army to the Air Force. Headquarters SAC transferred the 864th Strategic Missile Squadron (IRBM-Jupiter) from Huntsville, Alabama, to Cooke AFB. In April, Headquarters SAC activated the 576th Strategic Missile Squadron (ICBM-Atlas) at Cooke AFB. It was SAC's first ICBM squadron and first Atlas squadron. Initially, it consisted of two "soft" Series D Atlas complexes (576A and 576B). The first had three gantries while the second had three above ground coffin launchers (The term "coffin launcher" is used because the missile was laid on its side horizontally with the enclosure door or coffin-lid situated above. This configuration offered enhanced protection for the launcher.) similar to those planned for the first squadron in the field. Each complex had one launch control center. Thus, the squadron had a 3x2 configuration. In July, Construction began at Cooke AFB on the Operational System Test Facility (OSTF) for the Titan I ICBM. This was the prototype of the hardened Titan I launch control facility and consisted of one silo-lift launcher, blockhouse, and associated equipment. The first Thor IRBM arrived at Cooke AFB in August.[5][7]
On January 1, 1958, Lieutenant General David Wade of Louisiana was assigned as commander of the 1st Missile Division at Vandenberg. There he commanded the first operational missile unit in Air Force history. His commission was two-fold: (1) maintain operational capability with intercontinental ballistic missiles, and (2) establish operational readiness training for the missile crews of the SAC missile sites. Wade worked to develop the Discoverer, Samos, and Midas orbiting satellite programs.[8]

Base expansion

The southern portion of Cooke AFB (formerly Camp Cooke), consisting of more than 19,800 acres (8,000 ha), was transferred to the U.S. Navy in May 1958. The Navy was in the process of establishing a Pacific Missile Range (PMR) with a headquarters 100 miles (160 km) south of Cooke at Point Mugu, and instrumentation sites along the California coast and at various islands down range in the Pacific Ocean. The property it acquired was renamed the Naval Missile Facility at Point Arguello. It became a major launch head and range safety center for all missile and satellite launch operations conducted within the PMR.[5]
On 16 November 1963, Secretary of Defense Robert S. McNamara ordered a restructuring in the way the Department of Defense managed and operated its missile ranges and flight test facilities across the nation. Part of the force restructuring had the Navy transfer major sections of its Pacific Missile Range, including its Point Arguello installation, to the Air Force in two parts. The first transfer occurred on 1 July 1964. In the second part of the transfer, remote properties and mobile resources, explained in detail in the next section, were handed over to Vandenberg on 1 February 1965.[5]
With the Navy's missile program and range authorities scaled back to the area around Point Mugu, the Air Force now assumed full responsibility for missile range safety at Vandenberg and over much of the Pacific Ocean. The Air Force renamed this geographical area the Air Force Western Test Range. The designation remained until 1979 when it was shortened to the Western Test Range.[5]
The final land acquisition at Vandenberg occurred on 1 March 1966, after the Air Force had announced plans to construct Space Launch Complex 6 for its Manned Orbiting Laboratory (MOL) program. Flight safety corridors for the Titan III MOL vehicle reportedly extended south of Point Arguello and inland to an area known as Sudden Ranch. The Air Force sought to purchase this property, but when negotiations with the Sudden Estate Company failed to reach a compromise purchase price, the government turned to condemnation proceedings (under the power of eminent domain). By filing a Declaration of Taking with the federal court in Los Angeles, it obtained almost 15,000 acres (6,100 ha) of Sudden Ranch. Finalized on 20 December 1968, the federal court established $9,002,500 as the purchase price for the land. The total amount paid to the company with interest was $9,842,700.[5]
The annexation of Sudden Ranch increased the size of the base to its present 99,099 acres (40,104 ha). Today, Vandenberg stands as the third largest Air Force base after Eglin AFB in Florida, and Edwards AFB in California.[5]

Vandenberg Air Force Base

Vandenberg AFB Main gate
PGM-17 Thor IRBM
Atlas missiles on alert, 1960
Titan I missile emerges from its silo at Vandenberg Operational System Test Facility in 1960
Titan II test launch from Vandenberg
Minuteman 3 missile launch
Test launch of LGM-118 Peacekeeper
Ground-based Midcourse Defense (GMD) interceptor in launch silo at Vandenberg
On 4 October 1958, Cooke AFB was renamed Vandenberg AFB in honor of the late General Hoyt S. Vandenberg, the Air Force's second Chief of Staff.[5]
Ballistic missile testing
PGM-17 Thor
The transition from Army camp to missile base solidified on 15 December 1958 when Vandenberg AFB successfully launched its first missile, a PGM-17 Thor IRBM (Intermediate Range Ballistic Missile) The launch from Vandenberg inaugurated the intermediate-range ballistic missile portion of the Pacific Missile Range and was fired by a crew from the 1st Missile Division. The first successful launch of a Thor IRBM by a Royal Air Force crew took place at Vandenberg AFB on 16 April 1959. This launch was part of integrated weapon system training. In October, the first combat training launch of a Thor IRBM by a Royal Air Force crew was successful.
On 22 April 1960, the fourth and final British-based Thor IRBM squadron was turned over to the Royal Air Force by the Strategic Air Command, thus completing the deployment of this weapon system in the United Kingdom. The next month, the first missile to be removed from an operational unit and sent to Vandenberg AFB for confidence firing arrived from a Thor IRBM squadron (98th RAF Strategic Missile Squadron) in the United Kingdom. Confidence firing was the predecessor of SAC's operational test program.[5][7]
SM-65 Atlas
On 16 October 1958, the first Atlas ICBM launcher (576A-1) constructed at Vandenberg AFB, California, was accepted from the contractor by the 1st Missile Division. The first intercontinental ballistic missile, the SM-65D Atlas ICBM, was delivered and was accepted by SAC's 576th Strategic Missile Squadron on 18 February 1959. The first Atlas-D flew on 9 September 1959, and following the successful launch, General Thomas S. Power, CINCSAC, declared the Atlas ICBM to be operational. The following month, equipped with a nuclear warhead, the Atlas at Vandenberg became the first ICBM to be placed on alert in the United States. It was an SM-69D Atlas ICBM (AFSN 58-2190) on launcher 576A-1. In April 1960, the first attempted launch of a Series D Atlas ICBM from a coffin-type launcher (576B-2) was successful. This launcher was the prototype of the ones to be used at the first operational Atlas squadron, the 564th Strategic Missile Squadron, Francis E. Warren AFB, Wyoming. Following this successful launch, Major General David Wade, Commander of the 1st Missile Division, declared the coffin-type launcher to be operational.[7]
In July 1959, construction began on the first Series E Atlas ICBM coffin-type launcher (Atlas operational system test facility #1). On 28 February 1962, the first successful launch of the SM-65E Atlas took place. Construction began on the first SM-65F Atlas ICBM "silo-lift" launcher (Atlas operational system test facility #2) in November. The first Atlas F arrived in June 1961 and the first operationally configured Series F Atlas was successfully launched on 1 August 1962.[7]
During its testing phase, Vandenberg would operate two Atlas-D launch complexes; two Atlas-E, and three Atlas-F silos.[9] The Atlas-Ds were taken off alert at the 576th Strategic Missile Squadron (Complex 576B) in May 1964 as part of the phaseout of the Atlas from active ICBM service. The last Atlas F test launch was on 18 January 1965, and the 576th Strategic Missile Squadron was inactivated on 2 April 1966. The 576th SMS carried out 53 Atlas-D, 7 Atlas-E and 7 Atlas-F test launches between 1959–1965.[7]
The Atlas would remain in use as a launch vehicle for satellites from Vandenberg as a space booster configured with an RM-81 Agena upper stage rocket and the Atlas-Agena would launch many different types of satellites into orbit until its phaseout in the late 1980s.[5]
HGM-25A Titan I
The HGM-25A Titan I was the United States' first multistage ICBM. When designed and manufactured, the Titan I provided an additional nuclear deterrent to complement the U.S. Air Force's SM-65 Atlas missile. It was the first in a series of Titan rockets, and was an important step in building the Air Force's strategic nuclear forces.
In July 1958 construction began on the Titan I ICBM Operational System Test Facility (OSTF). This was the prototype of the hardened Titan I launch control facility at its operational sites. It consisted of one silo-lift launcher, blockhouse, and associated equipment. Designated "OSTF-8", the facility was destroyed on 3 December 1960 when the launcher elevator failed while lowering a fully fueled missile back into the silo. There were no injuries. This was the first silo accident at Vandenberg.[7]
The first "silo-lift" launch of the Titan I was successful in September 1961, and the first SAC launch of the ICBM was successful in January 1962. As a result, the Titan I ICBM launch complex (395-A1/A2/A3) at Vandenberg was turned over to the Strategic Air Command 395th Strategic Missile Squadron to perform test launches of the missile.[7]
However, the operational lifetime of the Titan I was short, as Secretary of Defense McNamara announced in November 1964 that all remaining first-generation ICBMs (Series E and F Atlas and Titan I) would be phased out (Project Added Effort) by the end of June 1965.[7]
On 5 March 1965, the last test launch of a Titan I ICBM conducted by the Strategic Air Command at Vandenberg was successful. The 395th SMS performed 19 test launches between 1963–1965 before moving on to exclusively Titan II testing. During the 1980s, some Titan I second stages were used as targets for early Strategic Defense Initiative (SDI) testing.[7]
LGM-25C Titan II
The LGM-25C Titan II ICBM was a second-generation ICBM with storable propellants, all inertial guidance, and in-silo launch capability. Construction of the first Titan II site began in 1962, and eventually Vandenberg operated four Titan II launch complexes.[7][10]
Most of the testing of the missile was done at Cape Canaveral AFS, Florida by the 6555th Aerospace Test Group, and the first successful underground silo launch of a Titan II ICBM took place at Vandenberg by the 395th SMS in April 1963. The first fully operational test took place in March 1965.[7]
On 25 March 1966, the 200th SAC missile launched from Vandenberg AFB, California was a Titan II. The operational testing of the Titan II continued until 1985.[7] Like its predecessor the Atlas ICBM, the Titan II GLV a derivative of that missile was used to launch Project Gemini spacecraft and the Titan 23G was used as a space booster to launch satellites. The final launch of a Titan II was made in 2003 when the last Titan IIG was expended.[5]
LGM-30 Minuteman
The advent of solid-propellant gave the three-stage LGM-30 Minuteman ICBM a major advantage over earlier liquid propellant ICBMs. In February 1961 construction began on Minuteman ICBM test launch facilities at Vandenberg. Silos 394A-1 through A-7 were the first constructed for use by the SAC 394th Strategic Missile Squadron.[5][7][11]
LGM-30A Minuteman IA flight tests began in September 1962. The first Minuteman IB test took place in May 1963. On 24 February 1966, the first attempted salvo (simultaneous) launch of two model "A" Minuteman I ICBMs from Vandenberg silos LF-04 (394A-3) and LF-06 (394-A5) was successful. This launch demonstrated the multiple countdown and launch techniques that would be used at operational bases under actual combat conditions. Minuteman I testing continued until 1968.[7][11]
LGM-30F Minuteman II testing began in August 1965 with the first launch conducted by Air Force Systems Command, was successful. The missile flew 5,000 miles (8,000 km) down the Pacific Missile Range and its reentry vehicle impacted in the target area.[7]
On 22 October 1970, the first attempted OT GT70F (Salvo) operational test launch (simultaneous) launch of two Minuteman II ICBMs was successful from LF-25 and LF-26. The last Minuteman II phase I operational test was performed in April 1972.[7][12]
The first LGM-30G Minuteman III phase II operational test was launched on 5 December 1972 from the LF-02 silo. The ICBM flew 800 miles (1,300 km) downrange before impacting in the Pacific Ocean. This was the beginning of Minuteman III launches which continue to this day from Vandenberg.[7]
In July 1974, the initial training of Minuteman missile combat crews, formerly performed by Air Training Command (ATC) instructors at Vandenberg AFB, California, was incorporated into the 4315th Combat Crew Training Squadron's Operational Readiness Training (ORT) program at Vandenberg. As a result of this action, the entire Minuteman missile combat training, from beginning (initial training) to end (upgrade training) became the responsibility of Strategic Air Command.[7]
SAC launched two Minuteman III ICBMs from Vandenberg AFB during exercise Global Shield, a comprehensive exercise of SAC's nuclear forces on 10 July 1979 from LF 08 and LF 09. One of these Global Shield missions, Glory Trip 40 GM, was the last Minuteman III phase I operational test flight. The missiles were launched 12 seconds apart by a SAC task force from the 90th Strategic Missile Wing, Francis E. Warren Air Force Base, Wyoming.[7]
Glory Trip 77GM, a Minuteman III Operational Test in September 1980, became the longest Minuteman flight test when its payload impacted a broad ocean area target over 5,600 nautical miles (10,400 km) downrange.[7]
LGM-118 Peacekeeper
The last ICBM tested from Vandenberg was the LGM-118 Peacekeeper (MX) ICBM beginning in June 1983. In additional to having a longer range than earlier ICBMs, the Peacekeeper could deliver up to 10 reentry vehicles to separate targets.[5] It was intended as a replacement for the LGM-30 Minuteman, but it suffered from a long development time, and was retired in 2005 before the Minuteman because of arms reduction treaties.
The first Peacekeeper ICBM was launched by Air Force Systems Command from an aboveground canister-type launch facility from TP-01 on 17 June 1983. This was the first "cold launch" of a missile at Vandenberg AFB, the missile reaching 600 mi (970 km) downrange. Two more test launches were conducted in 1983, the missile from TP-01.[7][13]
The first Peacekeeper with a Mark-21 test reentry vehicle was flight-tested from TP-01 on 15 June 1984. The Mark-21 resembled the reentry vehicle intended for the Peacekeeper weapon system. Two more test launches were conducted in 1984, the missile from TP-01. Air Force Systems Command conducted the final Peacekeeper launch from the aboveground TP-01 launch pad on 30 June 1985.[7][13]
The first silo launch from LF-05 took place on 24 August 1985 from LF-08. LF-02 began to be used in 1986 for additional launches. On 23 August 1986 the first launch of a completely operational hardware configured missile and launch facility, and also the first Peacekeeper launch by a SAC combat crew under the control of Air Force Systems Command took place from silo LF-02.[7][13]
A new Peacekeeper Missile Procedures Trainer was dedicated in March 1987. The $17 million facility featured a state-of-the-art computer based simulator which would be used to train and evaluate missile crew members. The first LGM-118 Peacekeepers were deployed to F.E. Warren AFB, Wyoming that year.[7][13]
LGM-118 Peacekeeper test launches continued from Vandenberg with a third silo, LF-05 becoming operational in March 1990. The final launch of a LGM-118 Peacekeeper 33PA took place on 21 July 2004 before the missile was retired from service.[7][13]
Ground Based Midcourse Defense Interceptor
The latest missile deployed at Vandenberg in 2005 is the Ground-based Interceptor (GBI) missile Suborbital booster for the US Missile Defense Agency's Ground-based Midcourse Defense system's EKV ballistic missile kill vehicle. It is part of a National missile defense System advocated by president George W. Bush. The OBV is under development by Orbital Sciences; for every interceptor missile there is a missile silo and a Silo Interface Vault (SIV), which is an underground electronics room adjacent to the silo.[5] The basic OBV consists of the upper three stages and guidance system from the Taurus orbital launch vehicle (essentially a wingless Pegasus-XL). The developmental OBV is launched from an open pad; the operational version is to be silo-launched.[14]
The first test firing of the OVB took place from former Atlas-F pad 576-E on 6 February 2003. Launch silo LF-23 is used for ongoing silo testing, with target missiles consisting of surplus inert Minuteman ICBM second and third stages being launched from the Kwajalein Meck launch site in the Pacific Range.[14][15]
Space exploration
Vandenberg launched the world's first polar orbiting satellite, Discoverer I on 28 February 1959. The launch vehicle for this mission consisted of a Thor-Agena combination.[5]
The Discoverer series of satellites provided other significant firsts for Vandenberg. For instance, in August 1960, the data capsule was ejected from Discoverer XIII in orbit and recovered from the Pacific Ocean to become the first man-made object ever retrieved from space. A week later, on 19 August, the descending capsule from Discoverer XIV was snared by an aircraft in flight for the first air recovery in history.[5]
Shrouded in a cover story of scientific research, Discoverer was actually the cover name for Corona, America's first photo reconnaissance satellite program. The publicized Discoverer series came to an end on 13 January 1962. After 37 launches or launch attempts, the cover story for Discoverer had simply worn out.[5]
Over the years, unmanned satellites of every description and purpose, including international satellites, were placed in orbit from Vandenberg by a widening variety of boosters. Among the parade of newer space boosters are the Titan IV (March 1991), Taurus (March 1994), Pegasus(April 1995), Delta II (February 1996), Atlas IIAS (December 1999), Minotaur (2000), and beginning in late 2005, the Falcon 1, the Delta IV, and Atlas V vehicles.[5]
The most ambitious Air Force endeavors at Vandenberg were the Manned Orbiting Laboratory (MOL) and the Space Shuttle programs. The MOL vehicle consisted of a Titan III booster carrying a modified Gemini space capsule (Gemini B) attached to a space laboratory. Construction work for MOL began at Space Launch Complex 6 (SLC-6) on South Vandenberg in March 1966. President Richard Nixon canceled the estimated $3 billion program in June 1969, as a result of cost overruns, completion delays, emerging new technologies, and the expense of fighting the Vietnam War. SLC-6 remained closed for the next decade.[5]
Space Shuttle
1985 photo of Space Shuttle Enterprise (OV-101) moving toward the shuttle assembly building at Vandenberg AFB Space Launch Complex 6 aboard its specially designed Cometto 76-wheel transporter. In the background are the payload changeout room and the payload preparation room.
In 1972, Vandenberg was selected as the West Coast Space Shuttle launch and landing site, but it was never used as such.
Space Launch Complex 6 (SLC-6, pronounced as "Slick Six"), originally built for the abandoned Manned Orbital Laboratory project, was extensively modified for shuttle operations. Over $4 billion was spent on the modifications to the complex and construction of associated infrastructure. The original Mobile Service Tower (MST) was lowered in height and two new flame ducts were added for the shuttle's Solid Rocket Boosters. Additional modifications or improvements included liquid hydrogen and liquid oxygen storage tanks, a payload preparation room, payload changeout room, a new launch tower with escape system for the shuttle crewmembers, sound suppression system and water reclamation area and a Shuttle Assembly Building were added to the original complex.
Additionally, the existing 8,500-foot (2,590 m) runway and overruns on the North Base flightline were lengthened to 15,000 feet (4580 m) to accommodate end-of-mission landings, along with construction of the Precision Approach and Path Indicator (PAPI) lights/large triangle arrows at both ends of the runway. Turn-around servicing and refurbishing of the Orbiter would be accomplished in the adjacent Orbiter Maintenance and Checkout Facility (OMCF). The Mate-Demate Facility, to load and unload the Orbiter from the Boeing 747 Shuttle Carrier Aircraft (SCA), was changed from the large structure found at Dryden Flight Research Center and Kennedy Space Center, to a transportable "erector set-like" Orbiter Lifting Frame (OLF). This facility design change was due to the possibility of needing to support a landing at a location where there was no facility to load the Orbiter onto the SCA. The OLF could be disassembled, loaded onto two C-5 aircraft, shipped to the overseas Orbiter landing site, and reassembled to load the Orbiter onto the Boeing 747. To transport the Orbiter from the OMCF (on North Vandenberg AFB) to SLC-6, the 22-mile (35 km) route was upgraded to accommodate a 76-wheeled vehicle built specifically to carry the Orbiter on its large flat deck utilizing the three external tank interface points (built by Commetto, Italy), versus towing the Orbiter on its landing gear that long distance.
Modification of SLC-6 to support polar missions had been problematic and expensive.[16] SLC-6 was still being prepared for its first Shuttle launch, mission STS-62-A targeted for 15 October 1986, when the Challenger disaster grounded the Shuttle fleet and set in motion a chain of events that finally led to the decision to cancel all west coast shuttle launches. The orbiter transporter was sent to Kennedy Space Center in Florida after the Vandenberg AFB launch site was abandoned and was used to transport the Orbiter from the Orbiter Processing Facility to the Vehicle Assembly Building.
Persistent site technical problems, however, and a joint decision by the Air Force and NASA to consolidate Shuttle operations at the Kennedy Space Center, following the Challenger tragedy in 1986, resulted in the official termination of the Shuttle program at Vandenberg on 26 December 1989.
Had the space shuttle program been successful at SLC-6, the West Coast operation would have contrasted with that at the Kennedy Space Center by creating the orbiter stack directly on the launch pad, rather than assembling it and then moving it. Three movable buildings on rails, the Launch Tower, Mobile Service Building and Payload Changeout Room were used to assemble the Shuttle orbiter, external tank and SRBs. These buildings were designed to protect the shuttle "stack" from high winds in the area and were used during a series of "fit tests" utilizing the space shuttle Enterprise in 1985.
California Spaceport
In 1995 the California Spaceport, operated by Spaceport Systems International was created at Vandenberg. The U.S. Air Force awarded a 25-year lease which included a payload processing facility and more than 100 acres (40 ha) of land for commercial launch facility construction.[citation needed]
The FAA-certified California Spaceport took advantage of Vandenberg's existing launch pads, runways, payload processing facilities, telemetry and tracking equipment. Work was completed in 2004 to build a rolling access gantry to support Minuteman and future Peacekeeper space booster derivatives. A new SLC 8 gantry was installed in 2005.[citation needed]
The Spaceport Systems International Commercial Launch Facility (CLF) Site was located just south of SLC 6 next to the evaporation ponds. The concern's Integrated Processing Facility (IPF) was originally built for the Space Shuttle Program at a cost in excess of $300 million. The building was designed to process three shuttle-class payloads simultaneously. The vertical sliding doors were modified to allow the transfer of encapsulated payloads from the IPF in support of EELV and other launch programs.[citation needed]
Delta IV
Since the demise of the shuttle program at Vandenberg, SLC 6 was once again been reconfigured, this time to support polar-orbit satellite launches by the new Delta IV family of launch vehicles, utilizing a Common Core Booster for class sizes all the way up to and including the Delta IV (Heavy) launcher. As it is currently configured, the 132-acre (53 ha) launch site features structures similar to Boeing's Delta IV SLC-37 launch site at Cape Canaveral Air Force Station in Florida, with a Fixed Umbilical Tower, Mobile Service Tower, Fixed Pad Erector, Launch Control Center and Operations Building, and a Horizontal Integration Facility. SLC-6 also features a Mobile Assembly Shelter that protects the rocket from adverse weather.
The first of the Delta IV launch vehicles to fly from SLC 6 successfully lifted off at 8:33 pm PDT on 27 June 2006 when a Delta IV Medium+ (4,2) rocket lofted NROL-22, a classified satellite for the National Reconnaissance Office, into orbit. The payload was successfully deployed approximately 54 minutes later.[citation needed]
Atlas V
The Atlas V was developed by Lockheed Martin as part of the US Air Force Evolved Expendable Launch Vehicle (EELV) program.
The Atlas V launches from Space Launch Complex 3-E. Lockheed Martin Commercial Launch Services markets the Atlas V to government and commercial customers worldwide.[17]
The first Atlas V launch vehicle to fly from SLC 3-E was launched on 19 March 2008 for the National Reconnaissance Office.[18]
All Atlas V launches from Vandenberg have been successful.
SpaceX Falcon
Falcon 1 on Pad 3W.
SpaceX briefly used SLC-3W during the early development of the Falcon 1 launch vehicle.[19][20]
Several test firings of the Falcon 1 were accomplished before SpaceX discovered that due to the overflight risk they would not be allowed to launch from Space Launch Complex 3-West (SLC-3W) while launch vehicles were standing on adjacent launch sites. SpaceX elected to abandon SLC-3W and instead develop their Omelek Island launch site for Falcon 1. No government compensation was paid to SpaceX over this issue.
SpaceX is currently reactivating Space Launch Complex 4-East (SLC 4E) for Falcon Heavy launches[21][22] following a 24-month refurbishment that started in 2011.[23] The draft environmental impact assessment with a finding of "no significant impact" was published in February 2011.[23] As of August 2011, demolition work got underway on the pad's fixed and mobile service towers, with most of the fixed tower removed and the hammerhead crane removed from the mobile service tower.[24]
At a press conference at the National Press Club in Washington, DC. on 5 April 2011, Elon Musk stated, "Falcon Heavy will arrive at our Vandenberg, California, launch complex by the end of next year (2012), with liftoff to follow soon thereafter (2013)."[22]
Launch sites

No comments:

Post a Comment